97精品国产,日韩欧美人妻视频,久久久久久久精,大香蕉更新成人不了

Online Service
Scan it
Support hotline
18681482740
Service Hotline:
18681482740
中文  |   English
Industry knowledge
Contact

Address: Floor 1, Building 2, Quanshengchang Industrial Park, Buyong Shajing Road, Shajing Street, Shenzhen

Contact: Mr. Li 18681482740

Email: lilinhan1314@126.com

Website: 555198.cn

Industry knowledge
Assembly of upper mold seat for precision stamping molds
07-19 / 2024

In order to shorten the processing cycle of stamping molds, enhance mold accuracy, unify the methods of operators, reduce anomalies that may occur during mold production, ensure production quality and mold life, the following explanation is given to the assembly process of the upper mold seat of the stamping mold.




The assembly of the upper die seat of the stamping mold is completed in the following 10 steps:




1. Splint Φ 12.000 positioning holes and auxiliary guide pillar holes, with a circumferential chamfer of R1.0 and polished




2. Use a 600 # oilstone or diamond file to remove burrs from the frame opening.




3. Use 600 #~1000 # oilstones to flatten both sides of the template and remove any burrs.




4. Use kerosene and alcohol to clean the mold surface and inner holes.




5. Install the auxiliary guide set into the same template.




6. Place the clamping part of the punch into the template frame and check if the punch is smoothly removed and placed. (Do not put the punch in after it is closed to avoid accidentally breaking the small punch)




7. Fix the punch with a pressure plate. (Note that the pressure plate should not be too close to the punch to avoid interference with the punch.) After fixing the punch, there should be a small amount of movement space to facilitate the natural alignment of the punch.




8. Gently close the detachment plate and the detachment back plate together into the clamp plate, and check if there is any interference in the positioning of the detachment back plate's pressing plate. When fully closed, there should be no gap between the detachment back plate and the clamp plate.




9. After joining, the cutting punch should exceed the pressing surface by more than 0.8mm (minus material thickness).




10. Insert the adjustment rod and upper mold adjustment punch, and rotate the screw until the adjustment punch approaches the effective height.






Through the above 10 steps, the assembly of the upper mold seat of the stamping mold has been completed.






Licao Precision is an ODM/OEM professional manufacturer specializing in the design and manufacturing of precision stamping molds and precision hardware stamping.


Links:Zibo CNC machine tool automatic car washing machine Qingdao refrigeration equipment grinder equipment steel grit fire inspection cabinet sweeper motor desulfurization denitrification equipment drawing mold washing machine automatic soldering machine server repair HART475 hand operator dust-free cloth dust-free paper stack screw type Sludge dehydration machine, precision repair welding machine, Shandong motor repair, rotary hot pot equipment, integrated ultrasonic cleaning machine, Zhongjie radial drilling machine, beer equipment, Shenzhen brass manufacturer, welcome lamp, lens digging, drilling rig, aluminum housing manufacturer, automatic dispensing machine, automatic screwing machine neodymium Iron boron magnet 4g router wireless bridge
We provide you with high quality products
又黄又粗又长又粗的视频| 欧美日韩精品在线久久| 日本不卡免费一二三四区高清| 好屌日妞欧美| 熟女高清露脸一区| 精品欧美乱码第一页| 日韩不一卡一二区| 好屌妞视频精品| 日B干B视频| 国内一级成人网站在线观看视频| 91偷拍一区二区| 中文一区字幕不卡| 亚洲尹人久久综合| 久久国产通道二| 日韩欧美精品在线…| 一级特黄欧美在线| 大香蕉免费在线视频十次啦综合啦| 色αv在线| A√全黄欧美| 国产人妻ThePorn| 女人大逼逼操视频| 日韩欧美乱伦视频| 欧美三日本三级少妇 | 18区视频国| 人妻中出AV在线| 精品久久妹子| 麻豆画精品传媒一区二区| 亚洲精品成人电影院| 高清无遮骚| 无码推油| 欧美日韩午夜福利高清视频网址| 日韩中文AU综合一区| 亚洲综合精品自拍粉嫩av| 夜夜操aV一二三区| 国产台湾无码视频免费看| 亚洲av永久综合在线观看尤物| 青青草,日韩无码| 日本在线不卡黄色| 国产日本亚洲| 伊人桃色婷婷| xgyav观看|